How to make a Gantt chart
- Type your tasks. Each row of the table is one task: its name, its Start and its End (or a Duration). Type over the example, paste cells from Excel or Google Sheets, or open an .xlsx, .xls or .csv file. You can also press Add task and fill a short form.
- Link the tasks. In Depends on, type the row number of the task that must end first. Leave the Start empty and the task starts when that task ends. Move the first task and the linked tasks follow.
- Add progress and resources. Type a percent in Progress % and a name in Resource. In the Resources tab, say how many of each resource there are: the chart shows where one is overbooked, and the orange Level resources button above the chart moves tasks later to fix it. The task list in the toolbar (All) shows only the late, open, in progress or done tasks.
- Set the view. Zoom from years down to one hour, pick the fields shown beside the chart, fold groups, and choose a style and colors in the Design tab.
- Save, print or download. Save the chart to a file and open it again later, print it on landscape pages, or download a PNG or SVG picture.
What is a Gantt chart?
A Gantt chart is a bar chart of a project's schedule. The tasks are listed down the left side and time runs from left to right. Each task is a bar that starts on the task's start date and ends on its end date, so one look shows what happens when, what runs at the same time, and how long the whole project takes.
The chart is named after Henry Gantt, an American engineer who made it popular in the 1910s. Today a Gantt chart usually also shows how much of each task is done (a darker part of the bar), which tasks must wait for others (arrows), the important dates (diamonds, called milestones) and a line for today.
The columns of the table
| Column | What to type | Example |
|---|---|---|
| Task | The name of the task. | Visual design |
| Start | The first day, with a time if you need one. Empty: the task starts when the tasks it depends on end. | 2026-11-16 16 Nov 2026 09:30 |
| End | The last day (the bar runs to the end of that day), or a date with a time. | 2026-11-20 |
| Duration | Used when End is empty. A number of days, or a number with m (minutes), h (hours), d (days), w (weeks) or mo (months). | 5 12h 2w |
| Progress % | How much is done, 0 to 100. Empty means not started yet. | 60 |
| Resource | Who or what does the task. Several names with commas. *2 after a name: two of them at once. | Anna, Dev team*2 |
| Depends on | The row numbers (or names) of the tasks that come first. Add SS, FF or SF for another type of link, and +2d for a wait (an offset). | 2, 5 3SS+2d |
| Group | Tasks with the same group stand together under a summary bar. | Design |
| Color | A color for this bar only: a name or a hex code. | green #8e44ad |
| Notes | Any remark. It shows when you point at the bar. | Waiting for the logo |
| Link type | Off until you tick it under Columns. FS, SS, FF or SF for the links in Depends on: one value for all of them, or one for each, in the same order. | SS FS, FF |
| Offset | Off until you tick it under Columns. A wait (+2d) or an overlap (-1d) for the links in Depends on: one value for all of them, or one for each, in the same order. | 2d 0, -1d |
When you open a file, the page looks at its header names. Columns called Task, Start, Finish, Duration, % Complete, Resource Names, Predecessors, Link Type or Lag go to the right place, whatever their order in the file. A file that has a Link type or an Offset column turns those two columns on.
Links, milestones and groups
Links. When task B depends on task A, the link has one of four types:
- Finish to start (FS): A must finish before B starts. This is the usual one, and the one you get when you type only the row number:
3. - Start to start (SS): A must start before B starts:
3SS. - Finish to finish (FF): A must finish before B finishes:
3FF. - Start to finish (SF): A must start before B finishes:
3SF.
An offset adds a wait with a plus sign, 3+2d (B starts two days after row 3 ends), or an overlap with a minus sign, 3-1d; it can be in hours too (3SS+4h). No offset means 0. You can also use the task's name, with a space before the two letters: Design, Design SS+2d. In the task form (click a bar), each link has its own line with the task, the type of link and the offset. If you would rather have them in the table, press Columns above it and tick Link type and Offset: a row with 1, 2 in Depends on, FS, FF in Link type and 0, -1d in Offset means the same as 1, 2FF-1d. A type or an offset written in Depends on itself wins over the column. If a task has its own Start and that date breaks a link, the arrow is red and a note under the chart says so.
Milestones. A row with a Start and no End and no Duration is a milestone: a diamond on that date. A row with only Depends on is a milestone at the moment the tasks before it end.
Groups. Tasks that share a name in Group are shown together under a dark summary bar, which runs from the first start to the last end of the group and shows the group's progress. Click the group's name to fold or open it.
Critical path. Turn it on in the Design tab to put a red frame round the tasks that cannot slip without moving the end of the project.
Change the chart with the mouse
- Drag a bar left or right to move the task.
- Drag the start or the end of a bar to change that date.
- Drag the small round handle under a bar to set its progress.
- Click a bar, or a task's name, to open the form with every field of the task.
- Drag a task's name, or a group's name, up or down in the list on the left to move it. Drop a task between the rows of a group and it joins that group; drop it between groups and it leaves its group. A group moves with all its tasks.
Each change is written into the table, so the table always holds your project. Undo takes the last change back. When you move a row, the row numbers change, and the numbers in Depends on are changed with them, so the links stay true. On a phone or a tablet, tap a bar to open the form.
Dates, durations and days off
Dates can be typed in many ways: 2026-11-16, 16 Nov 2026, Nov 16, 2026, 16/11/2026 or 11/16/2026, with a time such as 14:30 or 2:30 pm after it when you need one. For dates made of numbers only, the page looks at the whole table to see whether the day or the month comes first; you can also set it in the Design tab.
The chart skips Saturday and Sunday by default. The list at the right of the chart view in the toolbar (Skip Sat & Sun) shows the current choice: pick skip Friday and Saturday, skip Sunday or every day. The same list is in the Design tab, as Working days, and the two always show the same choice. A Duration of 5 days then means five working days, and a task that is placed by its links never starts on a day off. Dates you type stay as you typed them.
Resources and resource load
A resource is anyone or anything a task needs: a person, a team, a room, a machine. While you type in a Resource cell, the page offers the names you have already used, so each name is spelled the same way every time. In the Resources tab you can say how many of each resource there are. The Resource load rows under the chart then show how many are in use at each moment, and they turn red where the tasks ask for more than you have. To hide them, click the grey Resource load row under the chart (the small triangle shows it is open); click it again to show them. The same choice is in the Design tab, as Resource load rows. While they are hidden, they are not in a PNG, an SVG or a printed page either.
Resource leveling. When a resource is overbooked, the Level resources button above the chart turns a strong orange. Press it. The page moves tasks later, one at a time, until no resource is used by more than you have. A task that has started (Progress above 0) stays where it is, and the links stay true: a task never starts before the task it depends on ends. Each task that moves gets a Start date in the table, and Undo brings the old dates back. The end of the project may come later, because work that ran at the same time now runs one task after the other. Each press starts again from your own dates: if you add people to a resource later and press the button again, the tasks it moved come back as early as the resources allow, but never before the dates you typed. A date you change by hand after leveling is your own date from then on.
Zoom and the time line
One column of the time line can be a year, a quarter, a month, a week, a day, 12 hours, 6 hours or one hour. Pick it from the list in the toolbar, or zoom with the plus and minus buttons (or Ctrl and the mouse wheel). Fit shows the whole project across the width of the screen, and Today scrolls to today's line.
Show only some tasks
The last list in the toolbar, after Skip Sat & Sun, chooses which tasks the chart shows. It changes only what you see: the table, the dates and the saved file stay the same.
- All: every task.
- Open: the tasks that are not finished yet, that is, Progress is empty or below 100%.
- In progress: Progress is above 0% and below 100%.
- Late: the task has dates, it is not 100% done, and its End is before today.
- Done: Progress is 100%.
A task with an empty Progress counts as not started, so it is late when its End is already behind you. A task that ends today is late from tomorrow. A task with no dates has no bar and is never late, and a milestone is never late. A late task that has started is also In progress, and both kinds are Open. When the color choice in the Design tab is Status, the late tasks are red by the same rule, and their tip says late.
A group stays in the list while one of its tasks fits, and its summary bar still shows the whole group. The Resource load rows, the critical path and the zoom do not change. While a list other than All is on, you cannot drag a task's name up or down. PNG, SVG and Print show what is on the screen. The page starts with All every time, and a message says so when no task fits.
3D Gantt chart
The small list in the toolbar, after Today, sets the chart view: 2D (flat bars, the default), 3D or Tilt. Choose 3D to draw every bar as a small box, and the Resource load bars too. The dates do not change, only the look. The same choice is in the Design tab, as 3D bars, and it is saved with your chart.
Choose Tilt to see the whole chart from above, like a table with the far end of the time line farther away. The bars get their thickness at the bottom and the right. Tilt is for looking: you cannot drag the bars while the chart is tilted, and PNG, SVG and Print stay flat. Choose 2D or 3D to go back and edit.
Save, open, print and download
Save writes one small file to your computer with everything in it: the tasks, the progress, the resources and every setting. The file ends in .gnt, for example my-project.gnt. Open reads it back (files saved earlier with a .json name open too). To keep the chart in Google Drive, OneDrive or Dropbox, save the file into that folder. The page also keeps your last chart in this browser: press Last run to bring it back.
Print puts the whole time line on the width of a landscape page; a long list of tasks goes on as many pages as it needs, each with the dates on top. PNG and SVG download the chart as a picture, and Copy puts the picture on the clipboard, ready to paste into Word, PowerPoint or an email.
Frequently asked questions
Is this Gantt chart maker free? Do I need an account?
It is free, and there is no sign-up or login. Type over the example and your chart is ready.
Is my project sent to a server?
No. The chart is made in your browser. Your tasks stay on your computer: in the browser's own storage for Last run, and in the file you save.
Can I make a Gantt chart from Excel?
Yes. Copy the cells in Excel or Google Sheets and paste them into the task table, or open the .xlsx or .csv file with the file button. Columns named Task, Start, End (or Finish), Duration, Progress, Resource and Predecessors are put in the right place.
How do I add a milestone?
Type a row with a name and a Start date and leave End and Duration empty. The chart draws a diamond on that date. In the form, choose "Milestone" as the length.
How do I show that one task depends on another?
In the Depends on cell of the later task, type the row number of the earlier one. The chart draws an arrow between them. If you leave the later task's Start empty, it starts when the earlier one ends. For another type of link (start to start, finish to finish, start to finish) or a wait, click the bar and press Add a link in the form, or type it: 3SS+2d.
Can I plan in hours?
Yes. Type a time after the date (2026-11-16 09:30) and a Duration such as 90m or 2h, then zoom in until one column is one hour. Example 3 shows a day planned this way.
Can I continue my chart another day?
Yes. Press Save to keep the chart as a file, and Open to load it again, on this computer or another one. On the same browser, Last run also brings back the last chart.
If you like the page, please share or like it. Questions and suggestions are welcome at [email protected]. No reply? Check your spam folder.